Case Studies

Real results from real wholesalers

Three GCC wholesalers — one per region — moved from Excel + phone calls to the Wholesaler Portal and WhatsApp-native ordering. Here's what actually changed.

KSA Construction Enterprise 5 min read · 2026-10-06

Riyadh Power Supply cut project-quote cycles from 4 emails to 1 click

Saudi electrical distributor moves to container-load pricing with auto-applied fleet tiers

48h → 45min
Quote cycle time
per project order
−75%
Emails per order
average across Q3 deliveries
standard
Same-day site dispatch
was exception, now default
Problem

Procurement directors at major contractors needed per-project quotes. Every deal took 4+ emails and 2+ days to confirm — pricing, container logistics, and delivery windows all bounced between teams. Mid-five-figure project deals were getting held up by back-and-forth.

Solution

Riyadh Power Supply deployed Zark Enterprise with container-load pricing tiers, site-delivery scheduling, and full API integration to their existing procurement ERP. Sales reps now send a catalog link. Contractors configure quantities, see the container discount applied, and lock delivery dates themselves.

Result

Onboarding took longer than originally promised (3 weeks vs. 1 planned — enterprise integrations always do). But once live: quote cycles dropped from 2 days to under an hour. Same-day site delivery is now standard. The team closed two mega-projects in the first quarter using the new flow.

Impact Snapshot

Average across all 3 case studies

−62%
Inbound calls
3×
Faster processing
45 min
Quote cycles (was 48h)
4%
Dead-stock returns (was 18%)

Your story next

Every case study starts with a WhatsApp message. Send us yours — we'll show you what 3 days could change.